The short answer
Since 13 August 2026, NESO (the National Energy System Operator) can start planned rota power cuts if it sees a shortage of electricity coming at least 8 hours ahead. Areas are split into lettered blocks and switched off in turn, in cycles of about 3 hours, so no one area is off for long. A small number of critical sites, such as some major hospitals, are protected. Homes, including people on the Priority Services Register, are part of the rota. NESO's Winter Outlook (23 October 2026) says supplies are expected to stay secure this winter: these rules are a last resort, not a forecast.
Why people are searching for this
Searches for "NESO emergency power cut rules" have risen sharply. In August 2026, Ofgem's approval of new rota rules for the grid operator was reported in the news as new emergency powers for rolling blackouts. The change is real, but it is a planning tool for a rare event. It does not mean power cuts are expected.
Here is what changed, in plain words, from the official documents.
Two sets of rules: one new, one old
| DCRP (new, from 13 August 2026) | ESEC (government's emergency code) | |
|---|---|---|
| Who starts it | NESO, the grid operator | The Secretary of State, using emergency powers |
| When | A shortage seen at least 8 hours ahead | A long electricity shortage |
| How cuts work | Lettered blocks switched off in turn, about 3 hours each | Same: 18 lettered blocks, nominal 3-hour periods, eight a day |
| Who is protected | Sites on the Protected Sites List | Same list |
| Needs government emergency powers? | No | Yes |
Ofgem's decision explains why the new tool exists. The old short-notice tools cut the same customers each time. The government's emergency code shares cuts more fairly by rotating them, but it needs emergency powers and is built for long shortages. The new protocol gives NESO a quicker way to rotate cuts in the same fair way.
How a rota cut would work
- Each network area is split into 18 load blocks, each about 5% of demand, each with a letter.
- Up to 10% of demand is kept for protected sites and is not switched off.
- Under the new protocol, 4 blocks are kept back for sudden emergencies. The other 14 are switched off in alphabetical order on a cycle of about 3 hours.
- Network companies must have 8 blocks ready to switch off within 8 hours of NESO's notice, and all 14 within 24 hours.
- Under the government code, the "low-level" plan is the most likely one. It works through the blocks from A, usually for short peaks such as tea-time.
Who is protected, and who isn't
A few sites can stay on: critical infrastructure such as air traffic control, and some major hospitals with A&E departments. Protection isn't automatic: organisations must apply.
Homes are part of the rota. National Grid Electricity Distribution says this includes people on the Priority Services Register. That is why a plan for a 3-hour cut matters most for anyone who relies on powered medical equipment. If that's you and you don't have a plan, speak to your healthcare provider now.
The Priority Services Register is still worth joining. Ofgem says registered customers get priority support in an emergency and, where possible, advance notice of planned cuts. You can join if you've reached state pension age, are pregnant or have young children, have a disability or long-term health condition, or need medical equipment that runs on electricity, among other reasons.
How you would find out
- Your letter. Ofgem's decision says block letters are listed on customer bills. National Grid Electricity Distribution says to use your postcode at powercut105.com. Rotas are published only after emergency cuts are approved.
- The schedule. Under the government code, NESO advises by 14:00, the government confirms the plan by 15:00, and network companies get their schedules by 17:30 the day before.
- Reporting. Call 105 for a power cut in England, Scotland and Wales, or 03457 643643 in Northern Ireland (Be Ready).
Is a blackout coming this winter?
No official body has said so. NESO's Winter Outlook (23 October 2026) says supplies are expected to remain secure. It forecasts a margin of 5.9 GW, a 9.5% buffer above peak demand. NESO says there may be tighter periods, and that the "Electricity Margin Notices" you sometimes see in the news are a routine signal, not a sign of risk to supply.
Your 3-hour rota checklist
A 3-hour cut is short. A few simple steps make it easy.
- Write down your letter and the number 105 on paper.
- Charge phones and a power bank when a rota is announced. Be Ready says not to use your phone as a torch: it drains the battery.
- Torches, not candles. Be Ready says torches are safer.
- Keep the fridge and freezer shut. The Food Standards Agency says a fridge stays cold for up to 4 hours and a full freezer keeps food frozen for about 48 hours (about 24 if half full).
- Plan for heat. Be Ready says gas boilers and heat pumps won't work without power. Fill a flask with hot water before the cut and wear layers.
- Medical equipment. Know how long your backup lasts. Our runtime calculator can help you check a power bank or power station.
- Landline. Digital landlines often need home power. Be Ready says to check with your provider, and to call 999 or 112 from a mobile in a life-threatening emergency.
What to buy
About these links: plain links to ordinary retailer pages. We may earn from some links in future; we don't now. We haven’t tested these and we don’t rank them: they are examples that were in stock when we checked. Prices change. Check what you already own first. Full kit list
Torch or head torch, plus spare batteries
Look for: Runs on the same AA or AAA batteries as your other kit, so one spare pack covers everything. A head torch leaves both hands free.
- Alpkit Ionic 350 Lumen Head Torch · Alpkit · £15.99 (price on 1 November 2026) Shop
- Lifesystems Intensity 155 LED Head Torch · Lifesystems (UK brand store) · £19.99 (price on 1 November 2026) Shop
- Alpkit Kula 550 Lumen Head Torch · Alpkit · £19.99 (price on 1 November 2026) Shop
- Lifesystems Intensity 480 LED Hand Torch · Lifesystems (UK brand store) · £29.99 (price on 1 November 2026) Shop
- Dynamo Powered Wind-Up Pocket LED Torch · EVAQ8 · £3.60 (price on 1 November 2026) Shop
Battery or wind-up FM radio
Look for: FM (Be Ready asks for FM; DAB as well is fine). Both a crank and ordinary batteries, so you have two ways to power it.
Power bank
Look for: From a seller you know. Check the capacity (mAh) against your phone, and that you have the right cable for each phone. Keep it charged.
Vacuum flask
Look for: A 1 litre steel flask keeps water hot for hours, so you boil once and have hot drinks all day.
- Alpkit Peak 1000 Insulated Flask · Alpkit · £13.97 (price on 1 November 2026) Shop
Frequently asked questions
What are NESO's new emergency power cut rules?
Ofgem approved a Grid Code change on 30 July 2026, in force from 13 August 2026, that adds the Demand Control Rotation Protocol (DCRP). NESO can start it when it has at least 8 hours' warning of a shortage. Network companies then switch off lettered blocks of customers in turn, on a cycle of about 3 hours. It is a last-resort tool, used after other options.
Is a blackout coming this winter?
No official body has said so. NESO's Winter Outlook, published on 23 October 2026, says electricity supplies are expected to remain secure, with a forecast margin of 5.9 GW, a 9.5% buffer above peak demand. It says there may still be tighter periods, which its control room manages with normal tools.
How long would a rota power cut last?
The government's Electricity Supply Emergency Code works in nominal 3-hour periods, eight in a day. The DCRP rotates blocks on the same nominal 3-hour cycle. Most homes would expect a cut of about 3 hours at a time, not days.
How do I find my rota letter?
Ofgem's decision says load-block letters are listed on customer bills. National Grid Electricity Distribution says to enter your postcode at powercut105.com, and that rotas are only published once emergency cuts have been approved. Check both, and write the letter down.
Am I protected if I'm on the Priority Services Register?
Not from the rota itself. National Grid Electricity Distribution says homes, including those on the Priority Services Register, would be part of the rota. The register still matters: Ofgem says it gives priority support in an emergency and, where possible, advance notice of planned cuts. If you rely on powered medical equipment, talk to your healthcare provider now.
Sources
We opened each page on the date shown. Official advice changes: if a source says something different now, follow the source.
- Ofgem: Decision to approve Grid Code GC0176, Demand Control Rotation Protocol (PDF, published 30 July 2026) (read 1 November 2026)
- Ofgem: GC0176 Grid Code and DCRP/MP/25/06 Distribution Code proposed changes (read 1 November 2026)
- NESO: GC0176, Introduction of Demand Control Rotation Protocol within Operating Code 6 of the Grid Code (read 1 November 2026)
- DESNZ (GOV.UK): Electricity Supply Emergency Code (updated 13 April 2026) (read 1 November 2026)
- NESO: British electricity supplies secure this winter despite global instability (Winter Outlook, 23 October 2026) (read 1 November 2026)
- National Grid Electricity Distribution: Rota load disconnections (read 1 November 2026)
- Ofgem: Join your supplier's Priority Services Register (read 1 November 2026)
- GOV.UK Be Ready: power cuts (read 1 November 2026)
- Food Standards Agency (GOV.UK): Food safety in a power cut (read 1 November 2026)
Related guides
- Will there be blackouts this winter? What the 2026/27 outlook says
- Priority Services Register: a plain guide
- Who is my electricity network operator? UK power cuts by area
- National Grid power cut: how to report it and check the map
- Winter power cut checklist for UK homes
Free tools
- Power cuts near me
- Priority Services Register checker
- Power bank and power station runtime calculator
- Fridge and freezer power cut timer (FSA times)
We're an independent UK site, not the government. We check guides against official sources and link to them. In an emergency call 999.
More from the blog
Could the UK have a Spain-style blackout? What the official plans say
What happened in Spain and Portugal on 28 April 2025, how likely a national blackout is in Great Britain, and what the…
Getting startedHelping older and disabled relatives prepare: the Priority Services Register and a check-in plan
What the Priority Services Register gives older and disabled people, how to sign up, a plan for medical equipment and telecare in…
Power cutsPortable power stations: is one worth it, and what size do you need for a UK power cut?
A plain watt-hour worksheet for phones, lights, the router, CPAP and the fridge, what 300 Wh and 1,000 Wh really run, and what to…
Power cutsHow to charge your phone in a power cut
Keep your phone going in a power cut: save battery first, then a charged power bank, the car (outdoors, never in a garage), solar…